Industrial Cluster Wastewater Treatment Equipment Installation in the Mekong Delta
United Construction and Environment Technology Joint Stock Company was the construction and equipment installation contractor for an industrial cluster wastewater treatment system in the Mekong Delta, with a design capacity of 800 m³/day.

In addition to installing the wastewater treatment equipment, Hop Nhat Environment also delivered other environmental services for this project, including:
- Consulting on and obtaining the environmental permit;
- Consulting on and preparing the trial operation dossier following the environmental permit;
- Installing an automatic, continuous wastewater monitoring system.
Aerial view of the wastewater treatment system during the construction phase



Acceptance inspection of WWTP equipment installation
.jpg)


.jpg)
Construction and equipment installation phase




Photos from the completion phase
If your company needs design and construction of an industrial cluster wastewater treatment system, please contact our Hotline: 0938.857.768 for detailed consultation.