Environmental Impact Assessment (EIA) report preparation services
Drawing on its experience in environmental consulting, Hop Nhat provides comprehensive services for the preparation of Environmental Impact Assessment (EIA) reports. The company supports businesses throughout the entire process - from screening and project site surveys to report drafting, stakeholder consultation, finalization of documentation, and coordination during the official appraisal phase.
Article contents:
1. What is an Environmental Impact Assessment (EIA) report?
An Environmental Impact Assessment (EIA) is a process of analyzing, evaluating, identifying, and forecasting the impacts of an investment project on the environment. It also involves proposing measures to mitigate negative impacts and solutions for environmental protection throughout the project's implementation.
An EIA report is a document that presents the findings of this process; it is required for projects that, under the law, must undergo an EIA.
An EIA report is more than just a document for administrative procedures; it serves as a foundation for project owners to comprehensively examine environmental issues from the very beginning—the project preparation stage.
Through the EIA process, a project owner can determine:
- The project’s location, scale, capacity, and technology;
- The raw materials, fuels, and chemicals intended for use;
- Requirements for electricity, water, and other natural resources;
- Sources of wastewater, emissions, and waste generation;
- Areas and entities potentially affected by the project;
- Environmental impacts during both the construction and operational phases;
- Risks of environmental incidents;
- Infrastructure and measures for waste collection and treatment;
- Environmental management and monitoring programs;
- The project owner’s responsibilities regarding environmental protection.
Preparing an Environmental Impact Assessment (EIA) report correctly from the outset is therefore of significant importance, both for the legal timeline and for the design of the project’s environmental protection components.
2. Legal Basis for Preparing an Environmental Impact Assessment Report
As of September 2026, the identification of projects subject to an Environmental Impact Assessment (EIA), as well as the preparation and appraisal procedures for such reports, must be addressed in accordance with the prevailing legal framework, which notably includes the following:
2.1. Law on Environmental Protection 2020
The Law on Environmental Protection No. 72/2020/QH14 serves as the primary legal foundation, governing the classification of investment projects, the criteria for determining which projects require an EIA, the content of EIA reports, consultation and appraisal processes, and the responsibilities of project owners. Furthermore, certain provisions of the Law on Environmental Protection have been amended and supplemented by Law No. 146/2025/QH15, which took effect on January 1, 2026.
2.2. Decree No. 08/2022/ND-CP
Government Decree No. 08/2022/ND-CP, dated January 10, 2022, provides detailed regulations for the implementation of specific articles of the Law on Environmental Protection, including provisions related to the categorization of projects and the environmental impact assessment process. This Decree has subsequently been amended and supplemented by various legal instruments issued thereafter.
2.3. Decree No. 05/2025/ND-CP and Decree No. 48/2026/ND-CP
These documents further amend and supplement regulations concerning the implementation of the Law on Environmental Protection and Decree No. 08/2022/ND-CP.
When determining whether a project requires an Environmental Impact Assessment (EIA), one should not rely solely on a single document; rather, all applicable amendments currently in effect must be cross-referenced.
2.4. Circular No. 09/2026/TT-BTNMT
Effective from January 29, 2026, the template for an Environmental Impact Assessment report is updated to follow "Template No. 04" (found in Section 1 of the Appendix issued with Circular No. 09/2026/TT-BTNMT). This template replaces the previous "Template No. 04" found in Appendix II of Circular No. 02/2022/TT-BTNMT.
2.5. Resolution No. 66.19/2026/NQ-CP
This is a document that businesses should pay particular attention to in 2026. Issued by the Government on May 18, 2026, this Resolution contains provisions regarding the reduction and simplification of the scope of projects subject to an EIA, as well as the decentralization of authority for the appraisal of EIA reports. The Resolution remains in effect according to the terms specified within the document itself and should be consulted when preparing documentation during the current period.
Environmental legal regulations are currently undergoing many changes; therefore, businesses should review the requirements applicable at the time of project implementation, rather than mechanically applying the same documentation or procedures used for previous projects.
3. What does an Environmental Impact Assessment (EIA) report contain?
The specific content of an EIA report depends on the characteristics of the individual project. According to current templates, the documentation must systematically present information ranging from project details and impact assessments to environmental protection infrastructure and environmental management programs.
Typically, the preparation process requires addressing several key areas, including:
- Project information: The project owner, location, land area, scale, capacity, technology, project components, and implementation schedule.
- Environmental conditions of the project area: Natural and socio-economic factors, the current state of the environment, and entities potentially affected by the project.
- Raw materials and production activities: Raw materials, fuels, chemicals, and requirements for water, electricity, and other resources.
- Sources of waste generation: Wastewater, emissions, dust, general solid waste, hazardous waste, noise, vibration, heat, and other environmental factors.
- Impact assessment: An analysis of the project’s impacts during construction, equipment installation, and operation.
- Environmental protection infrastructure: Systems for wastewater collection and treatment, emission treatment, waste storage areas, noise-reduction measures, and other related facilities.
- Accident prevention and response: Identification of potential accident scenarios and the development of appropriate preventive and responsive measures.
- Environmental management and monitoring: Definition of management responsibilities, parameters to be controlled, and monitoring programs to be implemented during the project's operation.
4. Environmental Impact Assessment (EIA) Reporting Services in Compliance with Regulations
An Environmental Impact Assessment (EIA) report integrates legal requirements with complex technical content. For manufacturing projects, preparing such a report requires a thorough understanding of production processes, water balance, pollution sources, and the operating principles of environmental treatment systems.
Hop Nhat provides comprehensive, end-to-end EIA reporting services, offering businesses a single point of professional contact throughout the entire process. The workflow for EIA services at Hop Nhat is as follows:
Step 1: Receipt and Review of Project Information
The Hop Nhat team collects essential documentation, including:
- Legal documents of the enterprise;
- Investment documentation;
- Project location and site area;
- Business sector/industry;
- Scale and production capacity;
- Technological processes;
- List of machinery and equipment;
- Raw materials and chemicals;
- Water usage requirements;
- Sources of waste generation;
- Proposed environmental treatment systems.
Based on this information, Hop Nhat conducts a review to determine the applicable environmental obligations.
Step 2: Identification of Scope and Reviewing Authority
This step is particularly critical given the significant regulatory changes expected in 2026. Hop Nhat evaluates the project’s scale, type, and specific characteristics against current regulations to determine whether an EIA is required and to identify the appropriate authority responsible for reviewing and approving the documentation. Resolution No. 66.19/2026/NQ-CP provides for the decentralization of certain aspects of the Environmental Impact Assessment (EIA) review process—originally under the jurisdiction of the Ministry of Agriculture and Environment—to the Chairpersons of provincial-level People’s Committees.
Step 3: Site Survey and Data Collection
Depending on the nature of the project, the professional team conducts surveys of the site location, surrounding conditions, project layout, technology, and other relevant components. These surveys ensure that the data used in the report accurately reflects real-world conditions, rather than relying solely on design documentation.
Step 4: Preparation of the Environmental Impact Assessment Report
Hop Nhat compiles the necessary information, identifies sources of potential impact, forecasts the scale of these impacts, and develops appropriate environmental protection measures.
For projects involving wastewater or air emissions, the technical team also evaluates treatment technologies to ensure that the solutions proposed in the documentation remain feasible during the actual implementation of the project.
Step 5: Conduct consultation activities in accordance with regulations
Hop Nhat assists the project owner in preparing documentation and carrying out consultation-related tasks, following the procedures mandated by law for each specific case.
Step 6: Finalize and support the appraisal process
Once the documentation is complete, Hop Nhat collaborates with the enterprise throughout the procedural process, monitors the status of the application, and addresses any requirements for revisions, additions, or clarifications requested by the appraisal authority.
Step 7: Finalize documentation post-appraisal
Based on the appraisal results, the report is further reviewed and refined to ensure consistency across all content before the formal procedure is concluded.
5. Benefits of using a comprehensive EIA (Environmental Impact Assessment) service
Choosing a consulting firm with expertise in handling environmental procedures and documentation allows businesses to significantly reduce the time spent researching complex legal regulations and organizing internal personnel to prepare the necessary paperwork.
More importantly, a high-quality EIA document must ensure alignment across four key areas: legal requirements, production technology, waste generation sources, and environmental treatment facilities.
Hop Nhat’s services are designed to assist businesses by:
- Accurately identifying EIA obligations from the outset;
- Staying up-to-date with current legal regulations;
- Ensuring consistency across all project information;
- Developing environmental protection plans that are practical and well-suited to the project;
- Minimizing the time required for coordination between various parties;
- Providing support for addressing clarifications and revisions;
- Offering greater control over the project’s legal timeline.
In addition to preparing Environmental Impact Assessment (EIA) reports, Hop Nhat can continue to support your business with environmental procedures and tasks throughout the subsequent stages of your project, ensuring alignment between legal documentation and actual operations.
If you are preparing to launch a project but are unsure whether an Environmental Impact Assessment report is required, what documentation is needed, or which authorities to contact, Hop Nhat can review your project details and advise on the appropriate course of action. Please reach out via our hotline at 0938.857.768 or submit your details through our consultation form to receive dedicated assistance.